Key Roles: Your contractor and SVEC
To get permission to operate your system, your contractor submits all required paperwork to SVEC. The paperwork includes the Interconnection Application, a line diagram of the system and a copy of the final building permit. After SVEC approves the documents, we’ll send you official written permission to operate.
Timeline:
After SVEC receives the required paperwork from your contractor, permission to operate your system typically takes 5 to 10 business days, up to a maximum of 30 business days. TIP: Include your email address on the Interconnection Application to receive approval faster by email.
PLEASE NOTE: During the SVEC engineering system review, we may determine that upgrades are needed to support your renewable system. These upgrades may incur a cost and cause delay.